id summary reporter owner description type status priority component severity resolution keywords cc release 4168 Strange behaviour when hours remaining are large raymond.wooninck@… Joachim Hoessler "In my TRAC installation I am dealing with sometimes a larger number of remaining hours. I have the following situation : Developer 1 has 1024 hours remaining Developer 2 has 604 hours remaining Developer 4 has 609.5 houirs remaining If I use the [[WorkloadChart(milestone=W2R0.2D, owner=dev1|dev2|dev3, width=600, height=300)]] then I see strange results as the remaining hours. The total hours remaining is 933 and it is divided as Developer 1 has 0 hrs left, developer 2 has 440 hrs left and developer 3 has 493 hrs left. Is this a bug or am I doing something wrong here ?? I have more developers assigned to this milestone, but they should be ignored in the command." defect closed high EstimationToolsPlugin major invalid 0.11