﻿ticket,summary,type,release,owner,status,created,modified,_description,_reporter
8607,untrusted server cert support,defect,0.11,Yuji OKAZAKI,new,2011-03-15T20:42:36+01:00,2011-03-15T20:42:36+01:00,"Trying to connect to our server I realized that untrusted (self-signed) server certificate is not supported (r9953).

The solution is a patch for TracXMLRPC.getMember: add the following line right after `Set smlSv = CreateObject...`

`xmlSv.setOption(2) = ""13056"" 'SXH_OPTION_SELECT_CLIENT_SSL_CERT`

see http://msdn.microsoft.com/en-us/library/ms763811(v=vs.85).aspx


",imanzuk
8208,Feature to import/export wiki pages for/to TestManagerForTrac-Plugin,enhancement,0.12,Yuji OKAZAKI,assigned,2010-11-28T07:04:07+01:00,2010-12-06T02:02:12+01:00,"Hi,
do you think it's possible to implement similar import/export features for test cases provided by TestManagerForTracPlugin (http://trac-hacks.org/wiki/TestManagerForTracPlugin) ?",Peter Hofer
7463,implement a feature that can import/update MS-Project tasks feature.,enhancement,0.11,Yuji OKAZAKI,new,2010-08-08T17:22:07+02:00,2010-08-08T17:22:07+02:00,,Yuji OKAZAKI
7461,Intertrac usability.,defect,0.11,Yuji OKAZAKI,new,2010-08-08T17:10:47+02:00,2010-08-08T17:10:47+02:00,,Yuji OKAZAKI
7444,"VBA does not allow a time string ""0:0:0"".",defect,0.11,Yuji OKAZAKI,new,2010-08-02T09:25:58+02:00,2010-08-02T09:49:55+02:00,,Yuji OKAZAKI
7443,"When setting ResourceName, always PercentComplete become 0 percent.",defect,0.11,Yuji OKAZAKI,new,2010-08-02T09:14:27+02:00,2010-08-02T09:21:43+02:00,,Yuji OKAZAKI
6974,Is it possible to export tickets from Project to Trac?,enhancement,0.11,Yuji OKAZAKI,assigned,2010-04-13T19:17:36+02:00,2010-06-10T06:22:17+02:00,The Excel ticket editor can update Trac when done editing.  Can I manipulate schedule in Project and then put the tickets back into Trac?,Chris.Nelson@…
6973,Can't import dates from Trac to Project,defect,0.11,Yuji OKAZAKI,assigned,2010-04-13T19:13:43+02:00,2010-06-10T06:03:25+02:00,"I have tried setting Start (due_assign) and Finish (due_close) to ""2010-01-02"" and ""2010/01/02"" and the dates still come through as today.  What format should those fields take?

Also, if percent complete an integer or a fraction?  That is, if something is half done, should complete be .50 or 50?",Chris.Nelson@…
6975,Is the finest resolution for time in the Connector days?,defect,0.11,Yuji OKAZAKI,new,2010-04-13T19:21:15+02:00,2010-04-13T19:21:15+02:00,"The only time fields I can find related to the Connector are Start and Finish fields which are dates.  We often have tasks with 2-4 hour duration.  Project seems to support hours, days, weeks, and months.  Does the Connector always work with dates?",Chris.Nelson@…
6929,Ticket Edit spreadsheet needs to prompt for password,defect,0.11,Yuji OKAZAKI,assigned,2010-04-05T16:43:08+02:00,2010-04-11T20:10:51+02:00,"We use our Windows Domain credentials to access Trac and having to type our passwords into the spreadsheet in plain text is a big security hole.  If the password is left blank, the spreadsheet should prompt for a password.",Chris.Nelson@…
6042,Can't open Object IXMLHTTPRequest,defect,0.11,Yuji OKAZAKI,assigned,2009-10-27T13:37:55+01:00,2009-11-09T21:15:07+01:00,"If I want to connect via *.mpp I get the message:

{{{
The method open for the object IXMLHTTPRequest failed.
}}}

The excelsheet needs a never version of excel as I have. I'm using MSOffice 2007 SP2.

Am I right?

 didley

",didley@…
