    127127Bumps to the left indicate tasks that are behind schedule.
    128128
     129== Slack Time ==
    129130
    130131A Gantt chart may also show slack time for tasks, how much they can slip before affecting the overall schedule.  (Need an example.)
     132
     133[[Image(slack.PNG)]]
     134
    131135
    132136= Resource Utilization =